The load calculation comes first
Before any equipment is selected, a contractor should evaluate your home's heating load. The industry standard for this is ACCA Manual J, which the Air Conditioning Contractors of America maintains as the national ANSI-recognized method for residential equipment sizing. It accounts for your home's square footage, insulation levels, window area and type, ceiling height, air leakage, duct losses, and your local design temperature.
The result is a BTU heating load, which tells the contractor exactly how much furnace your house needs. It prevents oversizing, which is common in the Sacramento area where mild winters and rule-of-thumb sizing have left many homes with furnaces far larger than necessary. The furnace sizing guide explains why a right-sized furnace performs better and lasts longer.
If a contractor proposes a furnace without measuring your home or running any calculation, that is a red flag. Ask for the load calculation results in writing before agreeing to equipment.
Choosing the equipment
Once the load calculation sets the BTU target, the contractor recommends equipment that matches. The main decision points are efficiency tier and staging type.
Efficiency is measured in AFUE (Annual Fuel Utilization Efficiency). The current federal minimum is 80%. Condensing furnaces start at 90% and top out around 98%. Higher AFUE means less gas wasted up the flue, but it also means a different venting system and a condensate drain. The condensing furnace venting guide covers what that involves.
Staging refers to how the furnace modulates its output. A single-stage furnace runs at full capacity or not at all. A two-stage furnace has a low-fire and a high-fire setting. A modulating furnace adjusts in small increments to match the current demand. The staging comparison guide covers the comfort and efficiency tradeoffs.
A good contractor presents two or three options at different tiers and explains the tradeoffs clearly. You do not need the most expensive furnace. You need the one that matches your home's load, your duct system, and your comfort priorities.
The permit and compliance paperwork
California requires a mechanical permit for every furnace replacement. This is not optional and there is no exemption for like-for-like swaps. The contractor pulls the permit from your city or county building department before work begins.
The permit application includes a CF-1R energy compliance form, which documents the equipment's efficiency, the home's climate zone, and the compliance path being used. The contractor or an energy consultant prepares this form.
Most furnace replacements also trigger a HERS (Home Energy Rating System) duct leakage verification. A certified third-party rater tests the duct system after installation to confirm leakage is within code limits. For altered systems, the threshold is typically 15% of system airflow or 10% total leakage depending on the compliance path, according to the California Energy Commission's Title 24 requirements. The Title 24 duct leakage guide walks through what the test measures and what happens if the ducts fail.
A contractor who does not discuss permits before starting work should raise a question. Ask directly: will you pull a permit, and is HERS testing included in the scope?
What happens on install day
Most residential furnace replacements take one day, typically five to eight hours depending on the scope. Here is the general sequence.
| Step | What happens | Typical time |
|---|---|---|
| Preparation | Protect flooring and work area; shut off gas and power to the old furnace | 15-30 minutes |
| Old furnace removal | Disconnect gas, electrical, and duct connections; remove the unit | 30-60 minutes |
| Platform and connections | Set or modify the equipment platform; prep gas line, condensate, and electrical | 30-90 minutes |
| New furnace placement | Set the new furnace, level it, secure it to the platform | 15-30 minutes |
| Duct connections | Connect supply plenum, return plenum, and any modified branch runs | 30-60 minutes |
| Venting | Install or connect flue (B-vent) or PVC intake/exhaust (condensing) | 30-90 minutes |
| Gas and electrical | Connect gas line, check for leaks; wire thermostat, power, and control connections | 30-60 minutes |
| Startup and commissioning | Fire the furnace, verify ignition sequence, check gas pressure, measure temperature rise, test safety controls | 30-45 minutes |
| Cleanup | Remove old equipment, clean work area, brief homeowner on operation | 15-30 minutes |
Commissioning: what startup should include
Commissioning is the most important hour of the entire job. It is where the installer verifies that the furnace is working correctly and safely, not just that it fires.
A proper commissioning includes verifying the gas manifold pressure against the manufacturer's specification, measuring temperature rise across the heat exchanger (the difference between return air temperature and supply air temperature) and confirming it falls within the range printed on the furnace's rating plate, testing every safety control in the ignition sequence (draft inducer, pressure switch, ignitor, flame sensor), verifying that the blower ramps up and down at the correct speeds for heating and fan-only mode, and checking the thermostat's response to a call for heat and confirming the system cycles off cleanly.
On condensing furnaces, the installer also checks that the condensate drain flows freely, that the PVC vent terminations meet clearance requirements from windows, doors, and gas meters, and that the intake pipe draws outside air rather than garage or attic air.
If a contractor fires the furnace once, feels warm air at a register, and calls it done, the job is not finished. Ask whether temperature rise and gas pressure were measured.
The building inspection
After the installation, the contractor schedules a building inspection with the local jurisdiction. Inspection scheduling varies by city and county. In the Sacramento region, expect a window of five to fifteen business days after the request.
The inspector checks the gas connection, venting configuration, combustion air supply, electrical connections, clearances to combustibles, and the HERS duct leakage certificate. If the inspector finds a deficiency, the contractor corrects it and reschedules.
You should receive a signed-off permit card or a finaled permit record. Keep it with your home records. An open or unfiled permit can create complications at resale or during an insurance claim.
The HERS rater's visit is separate from the building inspection. In many cases, the rater tests the ducts before the building inspector arrives. The rater uploads results to the HERS registry, and the inspector references that record during the final sign-off.
What to ask your contractor before signing
The questions below help you evaluate whether a contractor is planning a compliant, complete installation or cutting corners.
- Will you perform a load calculation, and can I see the results? A contractor sizing by rule of thumb is guessing.
- Is the permit included in the quoted price? If not, who pulls it and what does it cost?
- Is HERS duct leakage testing included? If the ducts fail, is re-sealing and retesting covered?
- What is the venting plan? If moving from B-vent to PVC, where will the intake and exhaust terminate?
- What manufacturer warranty comes with the equipment, and does your workmanship warranty cover anything the manufacturer does not?
- Will you commission the furnace on startup, measure gas pressure, and verify temperature rise?
- What is the CSLB license number? You can verify it at the Contractors State License Board website. Furnace work requires a C-20 (Warm Air Heating) or C-38 license.
- For a full breakdown of what each line item means on a quote, see the install line items guide. For cost ranges in the Sacramento area, see the furnace replacement cost guide.
After the installation
Register the furnace warranty with the manufacturer. Most brands require online registration within 60 to 90 days of installation to activate the full warranty term. Your contractor may handle this, but verify it yourself. Without registration, the warranty typically drops to a shorter base term.
Replace the filter on the schedule the manufacturer recommends, usually every one to three months depending on the filter type and household conditions. A clogged filter on a new furnace causes the same overheating problems it caused on the old one. The filter and airflow guide explains why.
Schedule the first maintenance visit before the next heating season. Annual maintenance keeps the ignitor, flame sensor, and other wear parts in check and catches problems before they become mid-winter failures. The tune-up checklist covers what a thorough maintenance visit includes.
Common questions
How long does a furnace replacement take?
Most residential furnace replacements are completed in one day, typically five to eight hours. Jobs that require venting changes, gas-line resizing, or duct modifications may take longer. The building inspection happens separately, usually within one to two weeks after install.
Do I need to be home during the installation?
Someone should be available at the start to let the crew in and go over the scope, and at the end for the walkthrough. You do not need to watch every step, but being reachable by phone is useful in case the installer has a question about thermostat placement, access, or a condition they did not expect.
What happens if the ducts fail the HERS leakage test?
The contractor seals the identified leaks, usually disconnected or torn flex duct, unsealed boots, or leaky plenum connections, and the HERS rater retests. Title 24 also allows a fallback path where the contractor seals all accessible leaks and the rater verifies the work visually. The cost of sealing should be addressed in the original scope or discussed before the test.
Can I keep my old thermostat?
Usually yes, as long as it is compatible with the new furnace's control board. A single-stage furnace works with almost any 24-volt thermostat. A two-stage or modulating furnace may require a communicating thermostat or at least one with multi-stage heat support. Your contractor should confirm compatibility during the equipment selection step.
Is a load calculation really necessary for a like-for-like swap?
It is still the right practice. If the original furnace was oversized, which is common in Sacramento-area homes, replacing it with the same size perpetuates the problem. A load calculation takes an hour and ensures the new furnace matches what the house actually needs, not what someone guessed decades ago.
What should I do if the contractor does not mention a permit?
Ask directly. California law requires a mechanical permit for every furnace replacement. If a contractor is unwilling to pull one, that is a reason to choose a different contractor. An unpermitted installation can create problems with insurance claims, home sales, and code enforcement.
How soon after install can I use the furnace?
Immediately after commissioning. The installer fires the furnace and verifies operation as the final step on install day. You do not need to wait for the building inspection to use the furnace. The inspection confirms the work meets code; the commissioning confirms the furnace operates safely.
Sources
- ACCA (Air Conditioning Contractors of America) — Manual J: Residential Load Calculation (checked November 10, 2026)
- ERE Inspections — Duct Leakage Testing (Title 24 HERS) (checked November 10, 2026)
- Appliance Standards Awareness Project — Furnaces — Federal Efficiency Standards (checked November 10, 2026)
Program amounts and rules change. Confirm current terms with the source before you rely on them.
Reviewed and published by Statewide HVAC

Vasiliy Bardadin
Owner & Lead Technician
Statewide HVAC is owner-operated and Roseville-based.
Statewide HVAC is a CSLB-licensed heating and air conditioning contractor (#1023360) serving the Sacramento region from Roseville. Our guides are written for local homeowners, list their sources, and show the date they were last reviewed. About us